Cold weather creates challenges for concrete projects, but it does not make them impossible. Many homeowners and contractors wonder whether concrete will set properly during the winter months. The short answer is YES, concrete can set in cold weather, but the process requires additional precautions and planning to achieve proper strength and durability.
Understanding how temperature affects concrete helps you plan projects more effectively and avoid costly failures. Cold weather slows the chemical reactions that cause concrete to harden, which means curing takes longer and the material remains vulnerable to damage for extended periods. Knowing these factors allows you to take appropriate measures that protect your investment.
At Pro-Mix Concrete, we have over 20 years of experience supplying ready made concrete for projects throughout the UK and the surrounding areas. Our team understands the challenges of cold-weather concreting and provides expert guidance to ensure successful pours regardless of the season.
Get Your Free Quote Today: 020 7458 4747
How Temperature Affects Concrete Setting
Concrete sets through a chemical process called hydration. During hydration, water reacts with cement particles to form bonds that give concrete its strength. Temperature directly influences how quickly this reaction occurs.
The Science Behind Cold Weather Curing
When temperatures drop, the hydration process slows considerably. At 10°C, concrete takes approximately twice as long to gain strength compared to concrete poured at 20°C. Below 5°C, the reaction slows even further, and the concrete becomes vulnerable to frost damage before it reaches adequate strength.
The critical period occurs during the first 24 to 48 hours after pouring. During this time, concrete must be protected from freezing temperatures. If fresh concrete freezes before reaching a compressive strength of approximately 3.5 MPa, ice crystals form within the mixture and permanently damage the internal structure. This damage reduces the final strength by up to 50% and cannot be repaired.
Minimum Temperature for Pouring Concrete
Industry guidelines recommend maintaining concrete temperature above 5°C during placement and for at least 48 hours afterwards. This threshold ensures the hydration process continues at an acceptable rate and the concrete gains sufficient strength to resist frost damage.
Temperature Guidelines
Follow these temperature considerations for cold-weather concreting:
- Air temperature should be above 5°C and rising at the time of placement
- Concrete temperature at delivery should be between 10°C and 20°C
- Ground temperature should be above freezing before pouring
- Night-time temperatures should remain above 0°C for at least three consecutive days after placement
A reliable Concrete Supplier like Pro-Mix Concrete monitors weather forecasts closely and advises customers on optimal pouring times during the winter months.
Did You Know?
The ideal temperature for concrete curing is between 10°C and 20°C. At temperatures below 5°C, the hydration process slows by more than 50%, significantly extending the time required for concrete to reach safe strength levels.
Tips for Successful Cold-Weather Concrete Pours
Proper preparation and protection make cold-weather concreting achievable. These practical steps help ensure your project succeeds despite lower temperatures.
Before the Pour
Preparation begins well before the concrete arrives on site.
- Remove all ice, snow, and standing water from the pour area before delivery.
- Warm the subgrade if ground temperatures are near freezing to prevent rapid heat loss from the fresh concrete.
- Ensure formwork is completely free from frost and ice, as frozen surfaces cause the concrete to lose heat quickly and cure unevenly.
- Have insulating blankets and protective coverings ready and accessible before the concrete arrives.
- Schedule delivery during the warmest part of the day, typically between late morning and early afternoon, to maximise working time before temperatures drop.
During and After Placement
Protecting fresh concrete from cold temperatures requires immediate action once placement begins.
- Place and finish concrete as quickly as possible to minimise heat loss to the surrounding environment.
- Cover exposed surfaces with insulating blankets immediately after finishing to retain the heat generated during hydration.
- Use windbreaks around the pour area to prevent cold wind from accelerating heat loss.
- Monitor concrete temperature regularly during the first 48 hours using embedded thermometers or infrared sensors.
- Maintain protection until the concrete reaches adequate strength, which typically takes longer in cold conditions.
Cold Weather Concrete Mix Adjustments
Standard concrete mixes can be modified to perform better in cold conditions. These adjustments help maintain workability during placement and accelerate strength gain during curing.
Common Modifications
Professional suppliers offer several options for cold-weather projects:
- Accelerating admixtures speed up the hydration process and reduce setting time without compromising final strength
- Higher cement content generates more heat during hydration, helping maintain adequate temperatures within the concrete mass.
- Heated mixing water raises the initial concrete temperature, providing a head start before heat loss begins.
- Air entrainment improves freeze-thaw resistance in the hardened concrete, extending service life in cold climates.
When to Avoid Pouring Concrete
Despite available precautions, some conditions make concrete placement inadvisable. Recognising these situations prevents wasted materials and failed projects.
Avoid pouring concrete when air temperatures are below 0°C with no warming trend expected. Frozen ground that cannot be adequately thawed before placement creates problems with heat loss and uneven curing. Snow or freezing rain forecast during placement or initial curing poses significant risks to the fresh concrete surface.
Projects should also be postponed when adequate protection materials are unavailable or when nighttime temperatures will drop below -5°C within 48 hours of placement. The risks of concrete failure in these conditions outweigh the benefits of proceeding with the pour.
Bottom Line
Concrete can set successfully in cold weather when proper precautions are taken. The key factors include maintaining adequate temperatures during the critical first 48 hours, using appropriate mix designs, and protecting fresh concrete from freezing conditions.
Working with an experienced, ready made concrete supplier makes cold-weather projects significantly easier. Professional guidance on mix selection, delivery timing, and protection methods helps ensure your concrete achieves full strength despite challenging temperatures.
At Pro-Mix Concrete, we supply quality concrete throughout London and the surrounding areas with same-day and next-day delivery available. Our certified team provides expert advice for projects in any weather condition. We offer ready mix concrete, mix on site concrete, and concrete pump hire services for residential, commercial, and industrial projects.
Get Your Free Consultation: 020 7458 4747
Frequently Asked Questions
What is the minimum temperature for pouring concrete?
The minimum recommended temperature for pouring concrete is 5°C. The air temperature should be above this threshold and rising at the time of placement. Ground temperature should also be above freezing to prevent rapid heat loss from the fresh concrete.
How long does concrete take to set in cold weather?
Cold weather significantly extends setting and curing times. Concrete poured at 5°C takes approximately three times longer to reach initial set compared to concrete poured at 20°C. Full-strength development may take several weeks rather than the typical 28 days.
Can frozen concrete be saved?
Yes, concrete that freezes before reaching adequate strength is permanently damaged and must be replaced. The ice crystals disrupt the internal bond structure and reduce final strength by up to 50%. Frozen concrete typically must be removed and replaced.
What happens if it rains after pouring concrete in cold weather?
Rain combined with cold temperatures creates additional challenges. The extra moisture can dilute the surface and increase freeze risk. Cover fresh concrete immediately if rain is expected and ensure proper drainage to prevent water pooling on the surface.
Should I use hot water in concrete during winter?
Yes, heated mixing water helps maintain workability and supports proper hydration in cold conditions.
- Dennis Broderick
- Dennis Broderick is the founder and owner of Pro-Mix Concrete Company, a trusted name in ready-mix concrete solutions across the UK. With over 20 years of hands-on experience in the construction and concrete industry, Dennis brings unmatched expertise, practical insights, and a commitment to quality on every project - from residential driveways to large-scale commercial developments.
BlogJanuary 16, 2026What is the Best Mix for Concrete UK?
BlogJanuary 15, 2026Concrete Pumping vs Wheelbarrowing: Which Method is Right for Your Pour?
BlogJanuary 13, 2026How Do Concrete Boom Pumps Work?
BlogJanuary 10, 2026How Long Before You Can Walk or Drive on Fresh Concrete?